Home > News >

30-35 tons per hour sand drying production line was delivered to Novosibirsk, Russia.

Pubdate:2025-04-01

On April 19, 2024, CORINMAC one set of drying equipment was delivered to Novosibirsk, Russia.

This is the second time the customer has ordered our sand drying production line. 
 
The capacity of the first set was 15-20 tons per hour, which can not meet the customer's production needs. This time we provide customers with a dryer with cylinder diameter of 2.9 meters and cylinder length of 5.8 meters. The capacity can reach 30-35 tons per hour. 
 
Because of the cold winter in Novosibirsk, we have added insulation layers to the dryer cylinder and pulse dust collector according to the local climate conditions to ensure that the dryer does not lose heat, and the pulse dust collector does not condense water and block the filter bags.











Related news

CORINMAC 30-40TPH Dry Mortar Production Line Shipped to Colombia

Another milestone for CORINMAC! On July 22, 2026, CORINMAC complete set of 30-40tph(ton per hour) dry mortar production line equipment was successfully loaded into six containers and shipped to Colombia. This shipment underscores our commitment to ser

26/07/28

Project in Russia → Dry Mortar Packaging → Layer Palletizing → Stretch Hooding | CORINMAC

A fully custom-branded dry mortar packaging, palletizing, and stretch hooding line — engineered by CORINMAC, running smoothly in Russia. This is a fully customized dry mortar production, packaging, and palletizing line delivered by CORINMAC for a

26/07/08