Home > News >

30-35 tons per hour sand drying production line was delivered to Novosibirsk, Russia.

Pubdate:2025-04-01

On April 19, 2024, CORINMAC one set of drying equipment was delivered to Novosibirsk, Russia.

This is the second time the customer has ordered our sand drying production line. 
 
The capacity of the first set was 15-20 tons per hour, which can not meet the customer's production needs. This time we provide customers with a dryer with cylinder diameter of 2.9 meters and cylinder length of 5.8 meters. The capacity can reach 30-35 tons per hour. 
 
Because of the cold winter in Novosibirsk, we have added insulation layers to the dryer cylinder and pulse dust collector according to the local climate conditions to ensure that the dryer does not lose heat, and the pulse dust collector does not condense water and block the filter bags.











Related news

Dry Mortar Production Line with Sand Drying Production Line was Shipped to Myanmar

From July 20, 2025 to July 22, 2025. CORINMAC's dry mortar production line with sand drying production line was successfully loaded and shipped to Myanmar.   The whole set of dry mortar production line with sand drying production line equipment i

25/07/23

100T Cement Silos Were Shipped to Russia

On July 18, 2025. CORINMAC's 3 sets of 100T cement silos were successfully loaded and shipped to Russia. The dry mortar raw materials need to be stored, Silos are required. Silo for cement, sand, lime, etc. Sheet cement silo is a new type of

25/07/18