Home > News >

A small production line to Kazakhstan, capacity 3-5tph

Pubdate:2018-09-28

A small production line to Kazakhstan, producing 3-5 tons per hour.

Equipment List
No. Equipment name Model Qty. Power (kw)
1 Bag-breaking machine P-500 2sets 0,55
2 Screw conveyor LSY219х6м 2sets 3
3 Weighing warehouse 1М3 1set --
4 Screw conveyor LH-1 1set 5.5
5 Main steel frame --- 1set --
6 Finished product warehouse 2 m³ 1set ---
7 Packing machine F-JX-01 1set 3
8 Control cabinet -- 1set --
9 Screw conveyor LSY219х3.6м 1set 3
 

Related news

Dry Mortar Production Line with Sand Drying Production Line was Shipped to Myanmar

From July 20, 2025 to July 22, 2025. CORINMAC's dry mortar production line with sand drying production line was successfully loaded and shipped to Myanmar.   The whole set of dry mortar production line with sand drying production line equipment i

25/07/23

100T Cement Silos Were Shipped to Russia

On July 18, 2025. CORINMAC's 3 sets of 100T cement silos were successfully loaded and shipped to Russia. The dry mortar raw materials need to be stored, Silos are required. Silo for cement, sand, lime, etc. Sheet cement silo is a new type of

25/07/18